Construction & Project Management

Amunra aim at achieving the success of projects based on our expertise in construction Management & Economics.

ON GOING WORKS

a) CROSS COUNTRY PIPELINE FOR LPG & POL

Length of the POL pipeline   –           5.315 km

Size of the pipeline       –           Size 10” dia.; Piggable

Length of the LPG pipeline  –  8.44 km

Size of the pipeline    –  14”; Piggable

b) FABRICATION AND ERECTION OF PENSTOCK FOR UPPER THAMAKOSHI HYDRO ELECTRIC PROJECT, NEPAL

Project Name  –  460 MW Upper Tamakoshi HEP, Nepal
Specification :
Contracted length: 370 m vertical
Diameter : 3.6 m

c) KONDHANE DAM, MAHARASHTRA

  • To supply drinking water to Navi Mumbai Airport Influence  Notified Area (NAINA)
  • Water demand of CIDCO & NAINA area in year 2034 likely to be 1275 MLD.
  • 10.55 MCM of the total 105.97 MCM water storage shall be released for agriculture purpose.

OTHER SERVICES

  • Project management and owner‘s representative services
  • Project control
  • Site supervision
  • Project monitoring and construction monitoring
  • Master planning
  • Cost/Budget planning and control
  • Scheduling and progress control
  • Technical due diligence and project audits
  • Supply Chain management
  • Health and safety planning
  • Review & Value engineer
  • Expert opinions and consulting in the field of construction management & economics