Name Of The Work | Client | Nature Of Project | Period |
---|---|---|---|
Supply, Fabrication, Transportation, Handling, Storage, Site installation (including all embedment), Testing and Commissioning of the Penstock of approx. Dia 2.5 m and Steel In-Liners of dia. 4.4/2.5 m Khandong Stage- 1 | Abir Infrastructure Pvt Ltd | Green Field | 2023 -2025 |
Renovation of 3X12 MW Moyar HEP associated civil works | Andritz India Limited Bhopal | Brown Field | 2023-2024 |
Rehabilitation of 2x8 MW Patikari Hydro Power Project including associated Transmission line net work, Road infrastructure, Mandi Himachal Pradesh | Patikari Power Pvt. Limited Gurgaon | Brown Field | 2023-2024 |
Name Of The Work | Client | Nature Of Project | Period |
---|---|---|---|
Repair and Rehabilitation of Pelton turbine runners and underwater parts including HVOF Coating | Andritz India Limited New Delhi | Green Field | 2023 |
Fabrication and Installation of Steel Liners in Vertical Pressure Shaft in 400 MW Upper Thamakoshi HEP, Nepal | Andritz India Limited New Delhi | Green Field | 2021-2022 |
Repair and Renovation of 540m deep Vertical Pressure shaft of 2x50 MW Everest Power Projects Limited, Kullu, Himachal Pradesh | Everest Power Pvt Ltd New Delhi | Brown Field, Shutdown Works | 2021-2022 |
Rehabilitation of 2x2.5 MW Saini Hydro Project along with associated Road infrastructure, Slope stabilisation etc, Simla, Himachal Pradesh | Himshakti Power Pvt Limited New Delhi | Brown Field | 2021 |
On-line leakage arresting of Penstock of 1200 MW Teesta III Hydro Project, Sikkim | Aquagreen Engineering Brown Field and Management Pvt Ltd | Brown Field | 2020 |
Laying of 400 KV Double circuit Quad Moose transmission Line of Sikkim Power Transmission Ltd, Siliguri, West Bengal | BOMS Pvt Limited New Delhi | Green Field | 2018-2019 |